Hubei

Integrity, cooperation, development, and win-win

Hubei Suizhou 25t/h Biomass Gasification Energy Station Project

Project Description

     For the Hubei Suizhou Energy Station project, a 25t/h biomass gasifier, a 20t/h steam boiler and a 5 million calorie heat-conducting oil furnace have been built.

Project display


The project site

Suizhou, Hubei (Chemical Industry)

Heating design

1 set of 25 tons gasifier with 1 set of 20 steam tons/h steam boiler + 1 set of 5 million kcal thermal oil furnace

Heating requirements

24h/d     350days/year

Production date

2020 Nian 6 Yue

Steam quality requirements

10%-100%

Project instruction

① Designed in accordance with the requirements of safety regulations for heating equipment in chemical plants.

②A new high-power gasifier is supplied to 2 boilers at the same time, which can meet the heat requirements of steam and heat transfer oil.

③The steam boiler adopts a dual-burner design to efficiently respond to users with large changes in heat load.



Dual burner design to cope with load changes


Figure 1 25t/h biomass gasifier

2.jpg


3.jpg